TM 9-6115-668-13N O T E1.2.3.4.If necessary, install lifting device on lifting lugs (62) and (70).Lift synchronous generator (61) enough to allow spacing material to be removed if installed.Install mounting plate (49) on shock absorber (50) and secure with two bolts (46), two serrated lockwashers (47), and two washers (51) on shock absorber (50).Install shock absorber plate (54) on shock absorber (50) and secure with bolts (56) and serratedlock washers (55).5.Insert shock absorber (50) and secure to base (45) with two bolts (53), two serrated lock washers(52), and two washers (51).6.Lower synchronous generator (61) until weight has been transferred to shock absorbers (50).7.Install two bolts (60) and two serrated lock washers (59) and two washers (58).8.Remove lifting device from lifting lugs (62) and (70).9.Install upper part of partition (4) as instructed in paragraph 5.47, steps 22 through 24.10 Install air filter and piping (3) as instructed in paragraph 5.27.For easier positioning of components coat mating surfaces with lubricant.11. Install control cabinet (11) as instructed in paragraph 4.43 and install battery set (2) as instructed inparagraph 4.74.12. Install unit hood assembly (1) as instructed in paragraph 4.14.5 - 2 2 2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business