TM 9-6115-668-13
8.
Remove long eyebolt (65) from engine block of diesel engine (64).
9.
Install actuator cable (33) as instructed in paragraph 5.42.
10. Install pickup cable (32) as instructed in paragraph 5.44.
11.
Align exhaust pipes with header (30) and install on diesel engine (28) as instructed in paragraphs 4.82 and 4.83.
12.
Install subcurrent filter oil fines (29) on diesel engine (28) as instructed in paragraph 5.29.
13.
Install oil hoses (27) on heat exchanger box (22) and diesel engine (28) as instructed in paragraph 5.38.
14.. Install filter cup (25, 26) as instructed in paragraph 4.33.
15.
Install exhaust manifold (23) on heating unit (24) as instructed in paragraph 5.31.
16.
Install air hose (18) on header (20) and heat exchanger box (22) and tighten clamps (19,21).
17.
Install air hose (15) on generator (17) and tighten clamp (16).
18.
Install fuel lines (14) as instructed in paragraph 4.42.
19. Install EHG controller N7 (13) as instructed in paragraph 4.76.
20.
Install control cabinet unit (11) as instructed in paragraph 4.43.
21. Install generator wiring harness (12) as instructed in paragraph 5.46.
22.
Install upper part (4) of partition on lower part (6) of partition and push rubber seal (5) into place.
23.
Install four washers (9) four serrated lock washers (8). and four nuts (7) on threaded pins (10).
24.
Install air fitter housing and piping (3) as instructed in paragraph 5.27.
25.
Install battery set (2) as instructed in paragraph 4.74.
26.
Install unit hood assembly (1) as instructed in paragraph 4.14.
27.
Connect load bank to generator set and perform procedures in paragraph 5.53.
Change 1
5-217