TM 9-6115-668-13
9.
Pull plug connector 2J5 (9) off battery charging alternator regulator N6 (8).
10.
Tag cables to terminal strip 2X50 (10) and disconnect.
11.
Disconnect plug connector, X2 to X4 (7) above grounding stud (6).
12.
Remove cable from grounding stud (6).
13.
Remove cables from starter (5) as instructed in paragraph NO TAG.
14.
Remove cables from resistor (Shunt) R11 (4) as instructed in paragraph NO TAG.
15. Disconnect cables from battery charging alternator (3) as instructed in paragraph NO TAG and remove plug
connector 2J3.
16.
Remove five nuts (11). five serrated lock washers (12) and five washers (13) and plate (17) and five washers (14)
and five screws (15) from partition (16).
17.
Remove generator wiring harness (22) through partition (16) on base frame (16).
1.
Install generator wiring harness (22) through partition (16), on base frame (18), and secure with cable ties.
2.
Install five screws (15), five washers (14) into partition (16) and install plate (17), five washers (13), five serrated
lock washers (12) and five nuts (11). Tighten nuts (11).
3.
Connect cables to battery charging alternator (3) as instructed in paragraph NO TAG.
4.
Install cables on resistor (Shunt) R11 (4) as instructed in paragraph NO TAG.
5.
Install cables onto starter (5) as instructed in paragraph NO TAG.
6. Install cables onto grounding stud (6).
7.
Install plug connectors X2 to X4 (7).
8.
Noting correct labeling and position, connect cables to terminal strip 2X50 (10).
9.
Install plug connector 2J5 (9) in battery charging alternator regulator N6 (8).
10.
Insert generator wiring harness (21) through back panel 01 control cabinet assembly (33) and secure with locknut
(21).
11.
Connect generator wiring harness (22) to input terminal strip (19) of filter box FK (20).
12.
Install cover (23) on filter box FK (20) and secure with eight screws (26), eight serrated lock washers (25), and
eight washers (24).
13. Close control cabinet connection panel (27).
14. Install eighteen screws (30), eighteen serrated lock washers (29), and eighteen washers (28) on control unit
assembly (33).
15. Stow prop (31) and close front panel (32).
16.
Install unit hood assembly (1) as instructed in paragraph 4.14.
17. Connect load bank to generator set and perform procedures in paragraph 5.53.
5-212
Change 1