TM 9-6115-668-13
22. Insert short eyebolt (63) into engine block of diesel engine (64).
23. Hook lifting device into eyebolts (63, 65) on diesel engine (64) and into lifting lug (62) on synchro-
nous generator (61).
24. Remove two bolts (34) and two serrated lock washers (35) from shock absorbers (41) and engine
mount (36).
25. Remove two bolts (60), two serrated lock washers (59) and two washers (58) from shock absorbers
(50).
C A U T I O N
Secure diesel engine and synchronous generator to prevent tilting or
slippage.
26. Lift diesel engine (64) and synchronous generator (61) off shock absorbers (41, 50) on base frame
(45) and set down on suitable mounting blocks.
N O T E
For easier positioning of diesel engine and synchronous generator,
apply assembly lubricant to rubberseal on synchronous generator air
guide box and to diesel engine and synchronous generator shock ab-
sorbers.
1.
Place diesel engine (64) and synchronous generator (61) on shock absorbers (41, 50) on base
frame (45).
C A U T I O N
Use Loctite 243 when inserting bolts.
Tighten bolts to torque values in table (item G.1, appendix G).
N O T E
Thread in bolts (34, 60) only three turns when first installing.
2.
Install two bolts (60), two washers (58), two serrated lock washers (59) in generator mount (57) and
thread in three turns.
3.
Install two bolts (34), two serrated lock washers (35) in engine mount (36) and shock absorbers
(41), and thread in three turns,
4.
Torque bolts (34, 60) with torque wrench.
5.
Detach lifting device from eyebolts at positions (63, 65) on diesel engine (28) and from lifting lug
(62) on synchronous generator (61).
6.
Remove short eyebolt (63).
7.
Install bolt (69) with washer (68), serrated lock washer (67) and closure plate (66).
5 - 2 1 6