TM 9-6115-662-13&P5-9 WIRING HARNESS MAINTENANCE.This task covers: a.Removalc. Installationb.Repaird. InspectionINITIAL SETUPToolsTool Kit, General Mechanic’s(item 1, appendix B)Crimp Tool (item 4, appendix B)Materials/PartsWashers, LockEquipmentConditionsReferenceBoth generator sets shut down, para 2-5.3.1.REMOVAL1. Remove 21 machine screws (1, figure 5-13), lock washers (2), and flat washers (3) that secure theswitch box cover (4) to the switch box assembly. Discard lock washers.CAUTIONThe control panel connector P3 is connected to connector J4. Movement of the switch boxcover is limited. To prevent damage to control panel wiring harness, use cautionremoving switch box cover. Failure to observe this caution can result in equipmentdamage.2. Carefully position switch box cover (4) in front of switch box assembly.3. Disconnect P3 (7) from J4 (8) and set switch box cover (4) out of the way.4. Refer to figure FO-1, then label all leads and plugs at each end of the wiring harness to be replaced.5. Disconnect all leads and plugs.6. Remove wiring harness.INSPECTIONVisually inspect wiring harness for damaged or frayed wires, and loose, broken, or corroded connections.REPAIRRefer to appendix G and repair or manufacture wiring harness.5-25
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business