TM 9-6115-662-13&P
INSTALLATION
1. Position the new wiring harness in place.
2. Connect the leads and plugs as indicated on the wiring diagram (FO-1).
3. Connect P3 (7) to J4 (8) and position the switch box cover (4) over the switch box assembly.
4. Install new lock washers (2), flat washer (3), on each machine screw (1),and secure switch box
cover (4).
5-10 ELECTRICAL LEADS MAINTENANCE.
This task covers:
a. Removal
c.
Repair
b. Inspection
d.
Installation
Tools
Tool Kit, General Mechanics
(item 1, appendix B)
Crimp Tool (item 4, appendix B)
Materials/Parts
Washers, Lock
Equipment Conditions
Reference
Both generator sets shut down, para 2-5.3.1.
REMOVAL
1. Remove 21 machine screws (1, figure 5-13), flat washers (3), and lock washers (2) that secure the
switch box cover (4) to the switch box assembly. Discard lock washers.
CAUTION
The control panel connector P3 is connected to connector J4. Movement of the switch box
cover is limited. To prevent damage to control panel wiring harness, use caution
removing switch box cover. Failure to observe this caution can result in equipment
damage.
2. Carefully slide switch box cover (4) off switch box and set in front of switch box assembly,
3. Disconnect P3 (8) from J4 (8) and set switch box cover (4) out of the way.
4. Refer to FO-1, then label each end of lead to be replaced.
5. Disconnect and remove lead.
5-26