TM 9-6115-662-13&PINSPECTIONVisually inspect lead for loose, broken, or corroded connections.REPAIRRefer to appendix G and repair or manufacture lead.INSTALLATION1. Position new lead in place.2. Connect lead as indicated on wiring diagram (FO-1).3. Connect P3 (7) to J4 (8) and position the switch box cover (4) over the switch box assembly.4. Install new lock washers (2), flat washers (3), and screws (1) that secure switch box cover (4).5-11 BUS BAR MAINTENANCE.This task covers:Inspectionc.RepairRemovald.Installationa .b .INITIAL SETUPToolsEquipmentConditionsTool Kit, General Mechanic’sReference(item 1, appendix B)Both generator sets shut down, para 2-5.3.1.Helicoil Insertion Tool(item 7, appendix B)Materials/PartsWashers, LockInsert, Screw ThreadedINSPECTIONVisually inspect for corrosion, damage, or for loose or missing hardware.REMOVAL1. Remove 21 machine screws (1, figure 5-13), flat washers (3), and lock washers (2) that secure theswitch box cover (4) to the switch box assembly.5-27
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business