TM 9-6115-662-13&P
INSPECTION
Visually inspect lead for loose, broken, or corroded connections.
REPAIR
Refer to appendix G and repair or manufacture lead.
INSTALLATION
1. Position new lead in place.
2. Connect lead as indicated on wiring diagram (FO-1).
3. Connect P3 (7) to J4 (8) and position the switch box cover (4) over the switch box assembly.
4. Install new lock washers (2), flat washers (3), and screws (1) that secure switch box cover (4).
5-11 BUS BAR MAINTENANCE.
This task covers:
Inspection
c.
Repair
Removal
d.
Installation
a .
b .
INITIAL SETUP
Tools
Equipment Conditions
Tool Kit, General Mechanics
Reference
(item 1, appendix B)
Both generator sets shut down, para 2-5.3.1.
Helicoil Insertion Tool
(item 7, appendix B)
Materials/Parts
Washers, Lock
Insert, Screw Threaded
INSPECTION
Visually inspect for corrosion, damage, or for loose or missing hardware.
REMOVAL
1. Remove 21 machine screws (1, figure 5-13), flat washers (3), and lock washers (2) that secure the
switch box cover (4) to the switch box assembly.
5-27