P-9-TM-457-35
T . O . 35C2-3-442-2
TM 5-6115-457-34
TM-07464A-35
Water pump group.
1.
r. Install hydraulic tank (precise sets
2.
Starter motor assembly.
3.
s. Install oil cooler group (para-
graph 8-84).
Turbocharger group.
4.
t. Install fuel pump group (para-
Day tank assembly.
5.
graph 8-68).
Manual throttle control.
6.
Lube oil filter group.
7.
v. Install fan mounting group (para-
Ether atomizer.
8.
graph 8-37).
Air cleaner assembly.
9.
w. Refer to Operator and Organiza-
tional Maintenance Manual and install the
10.
Engine wiring harness.
following:
ENGINE TEST AFTER OVERHAUL
Section XXXI.
a. PRE-RUN-IN CHECKS.
8-236. GENERAL.
Following a complete overhaul or
NOTE
any major repair, involving the installation
Rotate engine in a clockwise direc-
or bearings, the engine should be run-in
tion only, when viewing engine
prior to release for service.
from front.
NOTE
1. Manually rotate engine by apply-
Make sure all necessary adjust-
ing a 1-1/8 socket with extension handle to
ments have been performed and
crankshaft nut inside of damper.
engine is fully serviced before
starting test.
2. Hold manual fuel shutdown lever
in the closed rack or off position (fig-
ADJUSTMENTS.
ure 8-66).
Connect engine assembly to a suita-
CAUTION
ble engine dynamometer equipped with a
cooling system and means of monitoring
Do not crank starter motor for a
engine oil pressure, coolant temperature,
period of more than 15 seconds.
and engine RPM.
8-146