TM 9-6115-668-135.21 POWER SUPPLY NT2 24 V~ MAINTENANCE.This task covers:a. Removalb. InstallationINITIALSETUPToolsEquipmentConditionsGeneral Mechanic’s Tool KitReference(item 2, appendix B)Generator Set 150 kW shutAutomotive Fuel and Electrical System Repair, Tool Kitdown,(item 3, appendix B)paragraph 2.5.2WARNINGDisconnect the negative battery cable first and then the positive bat-tery terminal cables. Failure to observe this warning could result inse-vere personal injury or death.CAUTIONTag all cables prior to removal to ensure correct connection of the cablesduring installation.REMOVAL1.Open flap (2, figure 5-37) on unit hood assembly (1).2.Open front panel (4) and secure with prop (5).NOTERemoval procedure for all power supply components NT2 24 V~ isthe same as for time relay K106, described below.3.Remove time relay K106 (27) as instructed in paragraph 5.20.4.On power supply component (28), push locking elements toward each other in direction of arrowand pull power supply component NT2 24 V~ (34) out of time relay K106 (27).INSTALLATIONNOTEInstallation procedure for all power supply components NT2 24 V~is the same as for time relay K26, described below.1.Insert power supply component NT2 24 V~ (12) into time relay K106 (27).2.Install time relay K106 (27) as instructed in paragraph 5.20.3.Stow prop (5) and close front panel (4).4. Close flap (2).5-150
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business