TM 9-6115-668-13
TESTING
1. Time relay K106 (27):
a. Start up engine preheating assembly as instructed in paragraph 2.5.1.
b. Check that switching cycle proceeds as follows:
Amber PULS LED goes on when supply voltage is applied.
Red PAUSE LED goes on at 60 seconds.
Red PAUSE LED lights up at 150 seconds.
Amber PULS LED lights up at 180 seconds.
Amber PULS LED or red PAUSE LED lights up at 840 seconds.
c. Shut down Generator Set 150 kW, paragraph 2.5.2.
2. Time relay K107 (6):
a. Start up engine preheating assembly as instructed in paragraph 2.5.1.
b. Check that switching cycle proceeds as follows:
Green LED activates when supply voltage is applied.
Green LED lights up at 60 seconds.
Green LED lights up at 150 seconds.
Green LED lights up at 180 seconds.
Green LED lights up at 840 seconds.
c. Shut down Generator Set 150 kW, paragraph 2.5.2.
3.
Time relay K108 (7):
a. Start up engine preheating assembly as instructed in paragraph 2.5.1.
b. Check that switching cycle proceeds as follows:
Green LED lights up at 60 seconds.
Green LED lights up at 150 seconds.
Green LED lights up at 180 seconds.
Green LED and amber LED go on at 180 seconds.
c. Shut down Generator Set 150 kW, paragraph 2.5.2.
4. Time relay K110 (20):
a. Start up engine preheating assembly as instructed in paragraph 2.5.1.
b. Check that switching cycle proceeds as follows:
Green LED activates when supply voltage is applied.
Green LED lights up after 60 seconds.
Green LED lights up after 150 seconds.
Green LED and amber LED light up at 180 seconds.
Green LED and amber LED light up at 840 seconds.
c. Shut down Generator Set 150 kW, paragraph 2.5.2.
5-146