TM 9-6115-668-13
4. Diode V103 (38), V104 (39):
N O T E
Removal procedure for diode V104 is the same as for diode V103, de-
scribed below.
a. Open cable conduit (40).
b. Record labeling and position of diode V103 (38) on terminal strip X101 (37) and disconnect
diode V103 (38).
c. Expose cable end terminal of diode V103 (38) and remove insulation at connection point with
cable.
d. Unsolder diode V103 (38) from cable using solder gun.
INSTALLATION
1.
Diode V101 (9), V102 (10), V105 (11), V106 (12):
N O T E
Installation procedure for diode V102, V105, V106 is the same as for
diode V101, described below.
a. Slide heat shrink tubing over cable end and solder diode V101 (9) to cable using solder gun.
b. Slide heat shrink tubing over solder joint and shrink on using heating gun.
c. Noting correct labeling and position, install cables and diode V101 (9) to top terminal (13) of aux-
iliary contactors K109 (14),
d. Place cable with diode V101 (9) in correct position and close cable conduit (40).
2. Diodes V103 (38), V104 (39):
N O T E
Installation procedure for diode V104 is the same as for diode V103,
described below.
a. Slide heat shrink tubing over cable end and solder diode V103 (38) to cable using solder gun.
b. Slide heat shrink tubing over solder joint and shrink on using heating gun.
c. Noting correct labeling and position, install cables and diode V103 (38) to terminal of terminal
strip X101 (37).
d. Place cable with diode V103 (38) in correct position and close cable conduit (40).
3.
Stow prop (5) and close front panel (4).
4.
Close flap (2).
5-144