TM 9-6115-668-13
NOTE
Installation procedure for current transformer T5 (52), T6 (54), T7 (55), T8 (61),
T9 (62), T10 (63), T11 (47) and T13 (50) is the same as for current transformer
T12 (36), described below.
When installing current transformer T1 (57), T2 (64), T3 (65), T4 (66), also Install
Insulator strip (60) and secure with three plastic screws (59).
a. Install current transformer T12 (36) with resistor R13 (38) on bus bar (46) from below.
b.
Install screw (33), serrated lock washer (34) and washer (35).
c.
Install screw (22), serrated lock washer (23) and washer (24).
d.
Noting correct labeling and position install cables (29) to current transformer T12 (36), tighten two screws
(25), and secure with cable ties.
e.
Install cables (45) on bus bar (46) and secure with screw (42), serrated lock washer (43), and washer (44).
3. Close control cabinet connector panel (9) and remove props.
4.
Install eighteen screws (6), eighteen serrated lock washers (7), and eighteen washers (8) securing control cabinet
connector panel (9) on control cabinet assembly (3).
5.
Stow prop (5) and close front panel (4).
6. Close flap (2).
7. Connect load bank to generator set and perform procedures in paragraph 5.53.
5-140
Change 1