TEST
1. Check continuity of output connector harness as listed in table 5-3.
Table 5-3. Output Connector Harness
Continuity
Check
.
FROM
TO
CONTINUITY
NO CONTINUITY
L0
L1
x
L0
L2
x
L0
L3
x
L0
GND
x
L1
L2
x
L1
L3
x
L1
GND
x
L2
L3
x
L2
GND
x
L3
GND
x
J1-A
L1
x
J1-B
L2
x
J1-C
L3
x
J1-N
x
J1-G
GND
x
2. If any wire fails
continuity
check, repair or replace output connector harness.
REMOVAL
1.
2.
3.
Remove nuts (8, figure 5-14), and internal tooth washers (9), from switch box load terminals (11).
NOTE
Other leads removed during removal of W11 harness leads must be replaced with
any attaching hardware.
Tag and remove output connector leads (10) from switch box load terminals (11).
Remove four nuts (7)
lock washers
(6), eight flat washers (2), chain (3) attached to dust cover, four
screws (1), and output connector (4).