TM 9-6115-660-13&PREPAIRRefer to figure G-4, appendix G.INSTALLATION1. Install output connector (4), chain (3) attached to dust cover, four screws (1), eight flat washers (2),four lock washers (6), and nuts (7).2. Refer to wiring diagram (figure FO-1) and tags placed on leads during removal, and install leads (10),internal tooth washers (9), and nuts (8) on load terminals (11).5-11 RELAYS K3-K6 MAINTENANCE.This task covers: a. Removalc. Installationb. TestI N I T I A L S E T UPToolsEquipmentConditionsTool Kit, General Mechanic’sReference(item 1, appendix B)Multimeter (item 3, appendix B)Both generator sets shut down; paragraph24 VDC Power Source (item 3, appendix B)2-5.3.3. Trailer handbrakes set, front supportleg/landing lowered, and rear leveling-supportMaterials/Partsjack lowered; paragraph 2-3.2.1. Switch boxcover open.Lock washersREMOVALRemove two screws (1, figure 5-15), washers (2), and relays (3) from relay socketS (4).Figure 5-15. Relay K3-K6 Removal.5-26
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business