TM 9-6115-660-13&P
5-12 PERMISSIVE PARALLELING RELAY MAINTENANCE.
This task covers: a. Removal
c. Installation
b. Test
INITIAL SETUP
Tools
Tool Kit, General Mechanics
(item 1, appendix B)
Multimeter (item 3, appendix B)
Power Oscillator, 50-420 Hz
(item 3, appendix B)
Materials/Parts
Equipment Conditions
Reference
Both generator sets shut down; paragraph
2-5.3.3. Trailer handbrakes set, front support
leg/landing lowered, and rear leveling-support
jack lowered; paragraph 2-3.2.1. Switch box
cover open.
Lock washers
5-28
Figure 5-17. Permissive Paralleling Relay.