Figure 5-13. Relay Board Harness Assembly W11 Removal.
Table 5-3. Output Connector Harness Continuity Check
TM-9-6115-660-13P Power Plant Diesel Engine Driven 1-Ton Trailer Mounted (With Racks) 3Kw 60 Hz AN/MJQ-42 Manual
Page Navigation
142
143
144
145
146
147
148
149
150
151
152
TM 9-6115-660-13&P
REMOVAL
1. Remove four screws (1),
lock washers
(2), flat washers (3), and invert relay board assembly (4).
NOTE
Other leads removed during removal of W11 harness leads must be replaced with any
attaching hardware.
2. Refer to
relay
board harness wire list (table 5-2), and tag and disconnect all W11 leads from terminal
board (5) and relay sockets (6).
3. Remove relay board harness W11.
REPAIR
Refer to figure G-2, appendix G.
INSTALLATION
1.
2.
3.
.
Position wiring harness W11 on relay board so that wire ends having terminal lugs are near TB1
terminals (5).
Refer to table 5-2 and connect all W11 leads.
Position
relay
board assembly (4), and install four flat washers (3),
lock washers
(2), and screws (1).
5-10 OUTPUT CONNECTOR HARNESS W10 MAINTENANCE.
This task covers: a.
Test
c. Repair
b.
Removal
d. Installation
INITIAL
SETUP
Tools
Equipment
Conditions
Tool Kit, General Mechanic’s
Reference
(item 1, appendix B)
Solder
Gun (item 3, appendix B)
Both
generator
sets shut down; paragraph
Crimping Tool, Hydraulic (item 4, appendix B)
2-5.3.3. Trailer handbrakes set, front support
Multimeter
(item
Materials/Parts
Solder
Lock washers
3, appendix B)
leg/landing lowered, and rear
leveling
-support
jack lowered; paragraph 2-3.2.1. Switch box
cover open.
5-23