TM 9-6115-660-13&P
6. Refer to table 5-1 and tag and disconnect all W9 wires from terminal board TB1 and TB2.
7. Refer to table 5-1 and wiring diagram (figure FO-1), and tag and disconnect all W9 wires from
switches S1, S2, and S10; indicator light housings XDS1 through XDS7; and permissive paralleling
relay PP.
8. Remove switch box wiring harness W9 from switch box.
REPAIR
Refer to figure G-3, appendix G.
INSTALLATION
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Position harness in switch box.
Using figures 5-7 and figure FO-1 as a reference, connect wires to switches S1, S2, and S10; indicator
light housings XDS1-XDS7; and permissive paralleling relay PP.
Refer to table 5-1 and connect all W9 leads to terminal boards TB-1 and TB-2.
Position relay board (4, figure 5-12) and install four flat washers (3), lock washers (2), and screws (1).
Install W9 harness leads (3, figure 5-11), internal tooth washer (2), and nut (1) on load terminals L0
and L3 (4).
Place insulation sleeving on leads W9-20 and W9-49 and solder leads to resistor R3.
Slide sleeving over solder joint and heat shrink.
Refer to table 5-1 and install W9 wires (7, figure 5-10), flat washers (6), lock washers (5), and nuts (4)
on contactor terminals (9).
Refer to table 5-1 and install W9 leads (12) on terminals (13) using screws (11).
Install contactor shield (3), two lock washers (2), and screws (1) over contactor terminals A2, B2,
and C2.
5-20