TM 9-6115-660-13&PTable 5-1. Switch Box Harness Wire List,WIRE NO.FROMITOW9-1TB1-17S10-2W9-2TB1-2PP-4W9-3TB1-3PP-3W9-4TB1-4K2-C2W9-5TB1-5XDS6-2W9-6TB1-6K2-22W9-7TB1-7K1-A2W9-8TB1-8K1-21W9-9TB1-9K1-C2W9-10TB1-10K2-11W9-11TB1-10PP-6W9-12TB1-11PP-8W9-13TB1-12K2-21W9-14TB1-13K1-22W9-15TB1-16S10-5W9-16 -----------W9-17TB2-5K2-A2W9-18 ------------W9-19TB2-4K2-YW9-20XDS6-1R3-1W9-21XDS5-2PP-2W9-22XDS5-1PP-1W9-23TB2-2K1-A2W9-24 ------------W9-25S2-2S10-4W9-26 ------------WIRE NO.IFROMTOW9-28S1-6PP-7W9-29S1-2S10-1W9-30S1-5K1-12W9-31S2-6PP-5W9-32-----------W9-33S2-5K2-12W9-34K1-11PP-8W9-35PP-4L0W9-36XDS7-2PP-1W9-37XDS7-1L3W9-38K1-22K2-32W9-39K2-32K1-A2W9-40K2-22K2-A2W9-41K1-32K2-A2W9-42K1-33K2-11W9-43K2-YL0W9-44K2-XS2-3W9-45K2-33K1-11W9-46K1-XS1-3W9-47K1-YL0W9-48K1-YTB2-1W9-49K2-A1R3-2W9-50PP-2PP-3W9-51TB1-18TB2-3W9-52TB2-3Ground2. Measure continuity of switch box harness W9 as listed in table 5-1. Refer to figure 5-7 and wiringdiagram (figure FO-1).3. If any wire fails continuity check, repair or replace switch box harness.4. If all wires pass continuity check, install relay board assembly (l), four flat washers (4), screws (7), lockwashers (3), and screws (2).REMOVALNOTEOther leads removed during removal of W9 harness leads must be replacedwith any attaching hardware.1. Remove two screws (1, figure 5-10), lock Washers (2), and contactor shields (3) that cover contactorterminals A2, B2, and C2 of contactor K1 and K2, and terminal A1 of contactor K2.2. Refer to table 5-1 and wiring diagram (figure FO-1), tag leads, and remove nut (4), lock washer (5),and flat washer (6) from contactor terminals (9) and remove W9 leads.3. Tag and remove leads (12) from terminals (13) by removing screws (11).5-17
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business