Figure 5-8. Switch Box Lead Connections.
Figure 5-9. Switch Box Relay Board Assembly
TM-9-6115-660-13P Power Plant Diesel Engine Driven 1-Ton Trailer Mounted (With Racks) 3Kw 60 Hz AN/MJQ-42 Manual
Page Navigation
134
135
136
137
138
139
140
141
142
143
144
TM 9-6115-660-13&P
2.
3.
4.
Remove nuts (8), lock washers (9), flat washers (10), and leads (11 and 12).
Locate W3-W5 connections to switch box load terminals L1, L2, and L3 (4, Detail B).
Remove nuts (1), internal tooth washers (2), and leads (3) from load terminal (4).
REPAIR
Refer to figure G-1, appendix G.
INSTALLATION
1.
2.
3.
Install leads W3, W4, and W5 (3), internal tooth washers (2), and nuts (1) on switch box load terminals
and tighten.
Install other end of leads W3-W6 (11 and 12), flat washers (10),
lock washers
(9), and nuts (8) on
contractors (13).
Install contactor shield (7), lock washer (6), and screw (5).
5-8 SWITCH BOX HARNESS W9 MAINTENANCE.
This
task covers: a. Test
c. Repair
b. Removal
d. Installation
INITIAL SETUP
Tools
Equipment
Conditions
Tool Kit, General Mechanic’s
Reference
(item 1, appendix B)
Solder
Gun (item 3, appendix B)
Both
generator
sets shut down; paragraph
Crimping Tool, Hand (item 3, appendix B)
2-5.3.3. Trailer handbrakes set, front
Multimeter
(item 3, appendix B)
support Leg/landing leg lowered, and rear
leveling
-support jack lowered; paragraph
Materials/Parts
2-3.2.1. Switch box cover open.
Lock washers
Solder
Insulation sleeving
TEST
1. Remove four screws (2, figure 5-9), lock washers (3), and flat washers (4), and invert
relay
board
assembly (1).
NOTE
Disconnect wire being checked at one end to isolate wire for
continuity
check.