Figure 4-9. Switch Box Replacement.
Indicator Light and Wire Assembly Repair and Replacement

Power Plant An/Mjq-18 (Nsn 6115-00-033-1398) (2) Mep-003A 10Kw 60Hz Generator Sets M103A3 2-Wheel, 1-1/2 Ton Modified Trailer Page Navigation
  45    46    47    48    49  50  51    52    53    54    55  
img
. .
ARMY TM 5-6115-633-14&P
b. Installation.
(1) Position switch box (7) on fender (3).
(2) Working underneath fender (3) insert four screws (4), four flat washers (5) and four lock-
washers (6) through fender and into switch box (7) and tighten.
(3) Connect power cables (1) to load terminals on generator sets (2). (Refer to TM 5-6115-
585-12.)
4-25.
Switch Box Repair.
WARNING
Make sure generator set circuit breakers are in OFF position before performing
any repairs on switch box. Failure to observe this precaution may result in
injury or death by electrocution.
a. Load Terminal and Terminal Board Replacement. (See figure 4-10.) There are four load
terminals on the switch box terminal board. This procedure is typical for all four. When reconnecting
wires, refer to the schematic inside the switch box (figure 4-7 or 4-8, as applicable) and to the
identification bands on the wires.
Figure 4-10. Load Terminal and Terminal Board Replacement.
4-21