1. Screw4. Frame7. Cover10. Nut2. Box cover5. Receptacle8. Screw11. Washer3. Box6. Screw9. Circuit breaker12. GrommetFigure 3-13.Convenience Receptaclec.Remove five screws (6) which secure re-Close circuit breaker and test for continuity. If de-ceptacle cover (7) to box cover (2).fective see figure 3-13 and proceed as follows:d.Remove two screws (8) which secure re-a.Repeat paragraph 3-89 aand tilt box cover (2)to disconnect electrical connections from circuitceptacle (5) to rear of box cover.breaker (9).e.Redate receptacle with new one in reverseb.Remove nut (10) and washer (11) whichsequence of removal.3-91. Circuit BreakerC h a n g e 7secure circuit breaker to box cover.c.Replace circuit breaker with new one inTest and Replacement.reverse sequence of removal.3 - 3 4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business