1. Wiring harness
8.
2. Wiring harness
9.
3. Screw
10.
4. Nut
11.
5. Clamp
12.
6. Wiring harness
13.
7. Control cubicle
13A.
assembly
14.
Blank panel
Blank panel
Fault indicator panel
Screw
Cover(Class 1 sets)
Screw, stop lever
Throttle lever
assembly
(Deleted)
15. (Deleted)
16. Nut
17. Washer
18. Nut
19. Nut
20. Washer
21. Manual control
assembly
Figure 3-17. Generator Set Controls
(2) Unscrew fuse holder cap (24) and remove
fuse (25). Install new fuse and replace fuse holder
cap (24).
3-104. Control Cubicle Assembly.
See figures 3-18, 19 and 20, and proceed as follows:
a. Inspection. Inspect the generator control
cubicle for defective, broken, cracked, or otherwise
defective components.
b. Testing. Testing of components of the control
cubicle is described under the appropriate heading
in paragraphs 3-105 through 3-130.
c. Repair. Repair by replacement of components
which do not function properly during testing.
C h a n g e 1
22. Lens
23. Lamp
24. Fuse holder cap
25. Fuse
26. Test or reset
switch
27. Dc control
circuit breaker
CAUTION
Turn engine off and remove the
battery negative connection be-
fore removing any electrical
leads to avoid possible short
circuit and resulting damage.
d. Replacement. If a component needs replace-
ment, gain access to the rear of the control cubicle
panel (96, fig. 3-18) by loosening the three quarter-
turn fastener and permitting the control cubicle panel
to pivot about its hinges in a forward direction. Re-
place control cubicle panel components which do not
function properly in step b (testing) as indicated in
following paragraphs. Replace control box (123, fig.
3-18) as described in paragraph 3-135 b.
3 - 3 8