NOTE
ELECTRIC AND FUEL BURNING WINTERIZATION KITS CAN NOT
BE OPERATED SIMULTANEOUSLY.
STARTING
STEP 1. CHECK FUEL SUPPLY AND TURN MANUAL HEATER FUEL SHUT-OFF VALVE (A) TO O N
STEP 2. OPEN BOTH COOLANT SHUTOFF VALVES LOCATED NEXT TO LUBE OIL COOLER (B) AND
THERMOSTAT ASSEMBLY (C).
STEP 3. OPEN COOLANT SELECTOR VALVE (D) BY PLACING HANDLE (IN 3-OCLOCK POSITION)
POINTING TOWARDS FUEL BURNING HEATER.
Figure 2-11. Fuel Burning Winterization Kit Operating Instructions (Sheet 1 of 2)
2-28
Change 12