A - RECEPTACLE J49
B -COOLANT SELECTOR VALVE
C - SHUTOFF VALVE
D - SHUT OFF VALVE
STARTING
NOTE
ELECTRIC AND FUEL WINTERIZATION KITS CAN NOT BE OPERA-
TED SIMULTANEOUSLY.
STEP 1. INSURE THAT A 205-240 VOLT,
50/60 OR 400 HZ, SINGLE PHASE SOURCE OF EXTERNAL POW-
ER TO ELECTRIC WINTERIZATION KIT RECEPTACLE 49 (A) HAS BEEN CONNECTED,
STEP 2. PLACE COOLANT SELECTOR VALVE (B) HANDLE (IN 12-0CLOCK POSITION) POINTING
STRAIGHT UP.
STEP 3. OPEN BOTH COOLANT SHUTOFF VALVES (C & D) LOCATED NEXT TO LUBE OIL COOLER AND
THERMOSTAT ASSEMBLY.
ME 6115-545-12/2-12 (1)
2 - 3 0
Figure 2-12. Electric Winterization Kit, Operating Instructions (Sheet 1 of 2)