A - RECEPTACLE J49B -COOLANT SELECTOR VALVEC - SHUTOFF VALVED - SHUT OFF VALVESTARTINGNOTEELECTRIC AND FUEL WINTERIZATION KITS CAN NOT BE OPERA-TED SIMULTANEOUSLY.STEP 1. INSURE THAT A 205-240 VOLT,50/60 OR 400 HZ, SINGLE PHASE SOURCE OF EXTERNAL POW-ER TO ELECTRIC WINTERIZATION KIT RECEPTACLE 49 (A) HAS BEEN CONNECTED,STEP 2. PLACE COOLANT SELECTOR VALVE (B) HANDLE (IN 12-0’CLOCK POSITION) POINTINGSTRAIGHT UP.STEP 3. OPEN BOTH COOLANT SHUTOFF VALVES (C & D) LOCATED NEXT TO LUBE OIL COOLER ANDTHERMOSTAT ASSEMBLY.ME 6115-545-12/2-12 (1)2 - 3 0Figure 2-12. Electric Winterization Kit, Operating Instructions (Sheet 1 of 2)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business