STEP 1.THE SET IN OPERATION SHALL BE DESIGNATED AS “ON-LINE” AND THE SETS PLACEDIN PARALLEL OPERATION SHALL BE DESIGNATED “ON-COMING.”STEP 2.PLACE THE OPERATIONS SWITCH (FIGURE 2-5) ON BOTH SETS IN THE PARALLELOPER-ATIONPOSITION.CAUTIONDO NOT CLOSE THE CIRCUIT BREAKER SWITCH AFTER STARTING THE“ON-COMING” SET AS SERIOUS DAMAGE TO ONE OR BOTH GENERATORSETS MAY RESULT.STEP 3.REFER TO FIGURE 2-6 AND 2-7 (DO NOT PERFORM STEP 8 OF FIGURE 2-7), AND STARTTHE “ON-COMING” SET.STEP 4.NOTE THE VOLTAGE INDICATED ON THE “ON-LINE” SET.ADJUST THE VOLTAGE OF THE“ON-COMING” SET TO THE VOLTAGE NOTED ON THE “ON-LINE” SET.STEP 5.ADJUST THE FREQUENCY OF THE “ON-COMING” SET TO A HIGHER VALUE THAN THAT OFTHE “ON-LINE” SET.STEP 6.SLOWLY REDUCELIGHTSFLASH AT 2 TO 3THE FREQUENCY OF THE “ON-COMING” SET UNTIL THESECOND INTERVALS.SYNCHRONIZINGCAUTIONDO NOT PLACE THE CIRCUIT BREAKER SWITCH OF THE “ON-COMING”SET IN THE CLOSEPOSITION WHILE THE SYNCHRONIZINGLIGHTSARELIT AS DAMAGE TO ONE OR BOTH GENERATOR SETS MAY RESULT.STEP 7.CAREFULLY WATCH THE SYNCHRONIZINGLIGHTSOF THE “ON-COMING” SET.AT THEINSTANT BOTH LIGHTS GO DARK, MOVE THE CIRCUIT BREAKER SWITCH OF THE “ON-COMING”TO THE CLOSEPOSITION.STEP 8.ADJUST THE VOLTAGE AND FREQUENCY RHEOSTATS OF BOTH SETS UNTIL LOAD ANDRENT ARE DIVIDED EQUALLY BETWEEN THE TWO GENERATOR SETS,AS EXPLAINED IN FIGURE2-10.1, PARAGRAPH A, STEPS 7 AND 8.SETCUR-STEP 9.MOVE THE CIRCUIT BREAKER SWITCH OF THE “ON-LINE” SET TO THE OPENPOSITION.STEP 10. PLACE THE OPERATIONS SWITCH OF THE “ON-COMING” SET TO THE SINGLEUNITOPER-ATIONPOSITION.STEP 11. READJUST VOLTAGE AND FREQUENCY OF THE “ON-COMING” SET AS NECESSARY.STEP 12. REFER TO FIGURE 2-8 AND STOP THE “ON-LINE” SET.Figure 2-10.1. Parallel Operation of Tactical Utility Generator Sets(Load Sharing and Load Transfer) (Sheet 4 of 4)Change 122-26.7/(2-26.8 blank)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business