NOTEVISUALLY CHECK THAT THE POWER CABLE AND PARALLEL CABLE AREIN ACCORDANCE WITH FIGURE 2-3B.IF THE CABLES ARE NOT AT-TACHED AS INDICATED, SHUT DOWN THE “ON-LINE” SET AND FOL-LOW INSTRUCTIONS IN PARAGRAPH 2-14D.CAUTIONDO NOT ATTEMPT LOAD CONNECTS IN PARAGRAPH 2-14D UNLESS ALLSETS ARE OFF AND NO OTHER EXTERNAL VOLTAGE IS APPLIED TOTHE LOAD.STEP 1.THE SET IN OPERATION SHALL BE DESIGNATED AS “ON-LINE” AND THE SETS PLACEDIN PARALLEL OPERATION SHALL BE DESIGNATED “ON-COMING.”STEP 20PLACE THE OPERATIONS SWITCH (FIGURE 2-5) ON BOTH SETS IN THE PARALLELOPER-ATIONPOSITION.CAUTIONDO NOT CLOSE THE CIRCUIT BREAKER SWITCH AFTER STARTING THE“ON-COMING” SET AS SERIOUS DAMAGE TO ONE OR BOTH GENERATORSETS MAY RESULT.STEP 3.REFER TO FIGURE 2-6 AND 2-7 (DO NOT PERFORM STEP 8 OF FIGURE 2-7), AND STARTTHE “ON-COMING” SET.STEP 4.NOTE THE VOLTAGE INDICATED ON THE “ON-LINE" SET.ADJUST THE VOLTAGE OF THE“ON-COMING" SET TO THE VOLTAGE NOTED ON THE “ON-LINE” SET.STEP 5.ADJUST THE FREQUENCY OF THE “ON-COMING” SET TO A HIGHER VALUE THAN THAT OFTHE “ON-LINE” SET.STEP 6.SLOWLY REDUCE THE FREQUENCY OF THE “ON-COMING” SET UNTIL THE SYNCHRONIZINGLIGHTS(FIGURE 2-5) FLASH AT 2 TO 3 SECOND INTERVALS.CAUTIONDO NOT PLACE THE CIRCUIT BREAKER SWITCH OF THE “ON-COMING”SET IN THE CLOSE POSITION WHILE THE SYNCHRONIZINGLIGHTSARE LIT AS DAMAGE TO ONE OR BOTH GENERATOR SETS MAY RESULT.STEP 7.CAREFULLY WATCH THE SYNCHRONIZINGLIGHTSOF THE “ON-COMING” SET.AT THEINSTANT BOTH LIGHTS GO DARK, MOVE THE CIRCUIT BREAKER SWITCH OF THE “ON-COMING” SETTO THE CLOSE POSITION.STEP 8.LOAD ANDSTEP 9.STEP 10.ADJUST THE VOLTAGE AND FREQUENCY RHEOSTATS OF THE “ON-COMING” SET UNTILCURRENT ARE DIVIDED EQUALLY BETWEEN THE TWO GENERATOR SETS.MOVE THE CIRCUIT BREAKER SWITCH OF THE “ON-LINE” SET TO THE OPEN POSITION.PLACE THE OPERATIONS SWITCH OF THE “ON-COMING” SET TO THE SINGLE UNIT OPER-ATIONPOSITION.Figure 2-10. Parallel Operation (Load Sharing and Load Transfer)2-26.2Change 12(Sheet 4 of 5)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business