A - PARALLEL OPERATION OF TACTICAL UTILITY GENERATOR SETS (LOAD SHARING)
STEP 1.
THE FIRST SET STARTED SHALL BE DESIGNATED AS ON-LINE AND THE SETS IN PAR-
ALLEL OPERATION SHALL BE DESIGNATED ON-COMING. WITH ALL SETS SHUT DOWN CONNECT
THE LOAD TERMINAL BOARDS AS DESCRIBED IN FIGURE 2-3.
CHECK THAT THE VOLTAGE RECON-
NECTION BOARDS (FIGURE 2-4) OF THE SETS ARE IDENTICALLY POSITIONED.
CAUTION
DO NOT PLACE THE CIRCUIT BREAKER SWITCH ON ANY OF THE
GENERATOR SETS IN THE CLOSE POSITION UNTIL SPECIFICAL-
LY DIRECTED TO DO SO.
CLOSING THE CIRCUIT BREAKER
SWITCH AT ANY OTHER TIME MAY SEVERELY DAMAGE ONE OR
MORE OF THE GENERATOR SETS.
CAUTION
CHECK THAT THE MAIN POWER SWITCH (FIGURE 2-3.2) AT THE
LOAD IS OPEN BEFORE ATTEMPTING TO PLACE A GENERATOR SET
ON LINE.
STEP 2.
START THE GENERATOR SETS AS DESCRIBED IN FIGURES 2-6 AND 2-7.
DO NOT PER-
FORM STEP 8 OF FIGURE 2-7.
STEP 3.
HOLD THE CKT BRK SWITCH (FIGURE 2-5) OF THE ON-LINE SET IN THE CLOSE PO-
SITION UNTIL THE CKT BRK INDICATOR LIGHT ILLUMINATES.
PLACE THE OPERATION SWITCH IN
THE PARALLEL POSITION.
STEP 4.
SET VOLT-AMPS TRANSFER SWITCH IN THE LI-LO POSITION.
ADJUST THE VOLTAGE
ADJUST RHEOSTAT UNTIL THE AC VOLTMETER INDICATES 122 VOLTS FOR THE 120/208 CONNEC-
TION AND 244 VOLTS FOR THE 240/416 CONNECTION.
ADJUST MANUAL SPEED CONTROL UNTIL
THE FREQUENCY METER INDICATES 61 HERTZ.
PLACE THE OPERATION SWITCH OF THE ON-COM-
ING SET IN THE PARALLEL POSITION.
NOTE
OBSERVE THE SYNCHRONIZING LIGHTS OF THE ON-COMING SET.
THE LIGHTS SHOULD GO ON AND OFF SIMULTANEOUSLY
IF THE
LIGHTS GO ON AND OFF ALTERNATELY, SETS ARE OUT OF PHASE.
STOP BOTH SETS AND CORRECT INTERCONNECT CABLES (FIGURE
2-3.1). IF PROBLEM PERSISTS, REFER TO NEXT HIGHER LEVEL
OF MAINTENANCE.
STEP 5.
ADJUST THE MANUAL SPEED CONTROL OF THE ON-COMING SET UNTIL THE SYNCHRON-
IZING LIGHTS, SIMULTANEOUSLY, REMAIN ON OR OFF AT 2 TO 3 SECOND INTERVALS.
STEP 6.
CAREFULLY OBSERVE THE SYNCHRONIZING LIGHTS OF THE ON-COMING SET AND, AT
THE INSTANT BOTH LIGHTS GO DARK, PLACE THE CKT BRK SWITCH OF THE ON-COMING SET TO
THE CLOSE POSITION.
WHEN THE CKT BRK INDICATOR LIGHT ILLUMINATES, THE SETS ARE OP-
ERATING IN PARALLEL.
Figure 2-10A.
Parallel Operation of Tactical Utility Generator Sets
(Load Sharing and Load Transfer) (Sheet 2 of 4)
Change 12
2-26.5