A - PARALLEL OPERATION (LOAD SHARING)STEP 1.THE FIRST SET STARTED SHALL BE DESIGNATED AS “ON-LINE” AND THE SETS IN PAR-ALLEL OPERATION SHALL BE DESIGNATED “ON-COMING.” WITH ALL SETS SHUT DOWN INSTALLTHE PARALLELING CABLE AND CONNECT THE LOAD TERMINAL BOARDS AS DESCRIBED IN FIGURE2-3A.CHECK THAT THE VOLTAGE RECONNECTION BOARDS (FIGURE 2-4) OF THE SETSTICALLY POSITIONED.CAUTIONDO NOT PLACE THE CIRCUIT BREAKER SWITCH ON ANY OF THE GEN-ERATOR SETS IN THE CLOSE POSITION UNTIL SPECIFICALLY DI-RECTED TO DO SO.CLOSING THE CIRCUIT BREAKER SWITCH ATANY OTHER TIME MAY SEVERELY DAMAGE ONE OR MORE OF THE GEN-ERATOR SETS.CAUTIONCHECK THAT THE MAIN POWER SWITCH (FIGURE 2-3.2) AT THE LOADIS OPEN BEFORE ATTEMPTING TO PLACE A GENERATOR SET ON LINE.STEP 2.START THE GENERATOR SETS AS DESCRIBED IN FIGURES 2-6 AND 2-7. DOFORM STEP 8 OF FIGURE 2-7.ARE IDEN-NOT PER-STEP 3.HOLD THE CKT BRK SWITCH (FIGURE 2-5) OF THE “ON-LINE” SET IN THE CLOSEPO-SITION UNTIL THE CKTBRK INDICATOR LIGHT ILLUMINATES.PLACE THE OPERATION SWITCHIN THE PARALLEL POSITION.STEP 4.ADJUST THE VOLTAGE ON BOTH SETS TO THE REQUIRED VALUE.ADJUST THE FREQUEN-CY OF THE “ON-LINE” SET TO THE REQUIRED VALUE.PLACE THE OPERATION SWITCH OF THE“ON-COMING” SET IN THE PARALLELPOSITION.NOTEOBSERVE THE SYNCHRONIZING LIGHTS OF THE “ON-COMING” SET.THE LIGHTS SHOULD GO ON AND OFF SIMULTANEOUSLY.IF THELIGHTS GO ON AND OFF ALTERNATELY, SETS ARE OUT OF PHASE.STOP BOTH SETS AND CORRECT INTERCONNECTION CABLES AS DE-SCRIBED IN (FIGuRE 2-3.1).IF THE PROBLEM PERSISTS, RE-FER TO NEXT HIGHER LEVEL OF MAINTENANCE.STEP 5.ADJUST THE FREQUENCY OF THE “ON-COMING” SET A LITTLE HIGHER THAN THE “ON-LINE” SET.THEN REDUCE THE FREQUENCY SLOWLY WITH THE FREQUENCY ADJUST RHEOSTAT UN-TIL THE SYNCHRONIZING LIGHTS REMAIN ON OR OFF AT 2 TO 3 SECOND INTERVALS.STEP 6.CAREFULLY OBSERVE THE SYNCHRONIZING LIGHTS OF THE “ON-COMING” SET AND, ATTHE INSTANT BOTH LIGHTS GO DARK, PLACE THE CKTBRK SWITCH OF THE “ON-COMING” SET TOTHE CLOSEPOSITION.WHEN THE CKTBRK INDICATOR LIGHT ILLUMINATES, THE SETS ARE OP-ERATING IN PARALLEL.Figure 2-10. Parallel Operation (Load Sharing and Load Transfer) (Sheet 2 of 5)2-26 Change 12
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business