TM 9-6115-668-13INSTALLATION1.2.3.4.5.6.7.8.9.C A U T I O NAfter working on J3 slave receptacle 24 V connector, reconnect thepositive terminal first and then the negative terminal of battery set (re-fer to paragraph 4.90).Install washer (26), negative cable (21), washer (25), serrated lock washer (24), and nut (23), onthreaded pin (22) and tighten nut (23).Pull positive cable (8) through bottom plate of base frame (4) and connect positive cable (8) tostarter (refer to paragraph 4.90).Insert J3 slave receptacle 24 V connector (12), with cap (15) and mount (16), into base frame (4)from the rear.Insert four screws (14) with four washers (13) in connector (12).Install four washers (11), four serrated lock washers (10), and four nuts (9) on four screws (14).Slide heat-shrink tubing (20) over negative cable (21) and positive cable (8).Install negative cable (21) on J3 slave receptacle 24 V connector (12), with screw (17), serratedlock washer (18) and washer (19). Tighten screw (17).Install positive cable (8) on J3 slave receptacle 24 V connector (12), with screw (5), serrated lockwasher (6), and washer (7). Tighten screw (5).Slide heat shrink tubing (20) over terminals of positive cable (8) and negative cable (21) and overJ3 slave receptacle 24 V connector (12).10. Shrink heat shrink tubing (20) using heating gun.11. Close flap (2).5-164
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business