ARMY TM 9-6115-604-12NAVY NAVFAC P-8-633-12CAUTIONPRIOR TO REMOVAL OF GENERATOR SET(S) FROM PARALLEL OPERATION, MAKE SURELOAD DOES NOT EXCEED FULL LOAD RATING OF GENERATOR SET(S) REMAINING ON -LINE.SEVERE DAMAGE TO EQUIPMENT MAY RESULT FROM FAILURE TO HEED THIS CAUTION .STEP 1. REDUCE LOAD UNTIL AC KILOWATTS METER INDICATES 60 KW OR LESS.STEP 2. OUTGOING SET SET BREAKER CONTROL SWITCH TO TRIP. OPEN INDICATOR WILL LIGHT.STEP 3. OUTGOING SET ALLOW ENGINE TO OPERATE 5 MINUTES AT NO LOAD.STEP 4. OUTGOING SET: SET MASTER SWITCH TO STOP.STEP 5. OUTGOING SET SET MAINTENANCE LOCKOUT SWITCH TO MAINTENANCE THIS SWITCH IS ONCABINET C IN THE CONTROL ROOM OF THE GENERATOR SET.STEP 6. SET 24v. DC CONTROL POWER CIRCUIT BREAKER TO OFF THIS BREAKER IS ON CABINET C IN THECONTROL ROOM OF THE GENERATOR SET.STEP 7. TO STOP ON-LINE UNIT REFER TO FIGURE 2-23.Figure 2-26. Removing generator Set From Remote Parallel Operation2-48
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business