ARMY TM 9-6115-464-12AIR FORCE TO 35C2-3-445-1NAVY NAVFAC P-8-624-121. Protective cover2. Buner fuel line3. Metering orifice assembly4. Filter body5. Gasket6. Sintered fitter7. Heater assemblyFigure 5-2. Fuel Burning Winterization Kit Heater Assembly, Inspection and ServiceUse extreme care when installing the orifice assembly. Its pin hole can easilybe dogged by any small particlde of foreign matter. Equipment damage couldresult if caution is not observed.(8) Install orifice assembly (3) and connect burner fuel line (2).(9) Install protective cover (1) and tighten its fasteners.5-5
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business