P-8-627-34
T O 35C2-3-442-2
TM-07464A-35
TM 5-6115-457-34
Figure 2-9.
Front lower right panel drilling dimensions
for fuel bleed line tubing
(30) Battery Cables. Refer to
refer to the Operator and Organizational Main-
Operator and Organizational Maintenance
tenance Manual for modification instructions.
Manual and connect the battery cables as
illustrated.
(31). Winterization Kits. If the
generator set contains a winterization kit,
2-66
Change 8