P-8-627-34
T O 35C2-3-442-2
TM-07464A-35
TM 5-6115-457-34
(d) Overspend switch cable
(23) Air Cleaner. Refer to Opera-
a s s e m b l y . Install connector P62 on the
tor and Organizational Maintenance Manual
cable assembly (85A) to J62 on the over-
and install the air cleaner as shown.
(24) Manual Speed Control. Refer
speed switch (107). Connect loose end of
cable assembly (85A) to magnetic pickup
Maintenance Manual and connect the manual
(85B).
speed control in the reverse sequence of in-
dex numbers assigned.
(19) Governor Actuator and
(25) Radiator and Housing Frame
Linkage (ME P116A only). Refer to figure
Assembly. Refer to Operator and Organiza-
2-8, sheet 1 and install the governor actua-
tional Maintenance Manual and install the
tore (51) and the associated linkage as shown.
radiator and housing frame assembly in the
Pay particular attention to the following:
reverse sequence of index numbers assigned.
Pay particular attention to the following:
(a) Install the final fuel
(a) Install new radiator hoses;
filter supplied with the 3306(T) engine to fuel
filter bracket (58) using screws (53) and
(101).
washers (54).
(26) Doors and Covers. Refer to
Operator and Organizational Maintenance
(20) Lifting Frame Assembly.
Manual and install the doors and covers in the
reverse sequence of index numbers assigned.
skid base.
Hose. Refer to Operator and Organizational
breather tube and hose in reverse sequence
(21) Day Tank. Refer to Opera-
illustrated.
tor and Organizational Maintenance Manual
and install the day tank in the reverse se-
quence of index numbers assigned.
Refer to Operator and Organizational Main-
tenance Manual and install muffler and ex-
(22) Engine Wiring Harness.
haust pipe.
Refer to figure 2-8 and Operator and Organi-
zational Maintenance Manual and install the
(29) Engine Fuel Bleed Line
engine wiring harriess (108A). Pay parti-
cular attention to the following:
and install the engine fuel bleed line (72) as
follows:
(a) Install connector P37
to J37 on overspeed switch (107).
WARNING
(b) Connect harness con-
chips which may enter the eye.
nectors and wires.
Eye protection is required.
(c) Secure harnesses with
clamps.
drill a 0.438 inch hole as illustrated.
(d) Join harnesses in com-
mon run from one side of engine to opposite
stall grommet (112). Install the engine fuel
side at six inch intervals with tiedown straps. bleed line (72) as illustrated.
Change 8
2-65