P - 8 - 6 2 7 - 3 4 T O 35C2-3-442-2
TM-07464A-35 TM 5-6115-457-34
Section II. LIFTING FRAME ASSEMBLY
e. Remove nuts (2 and 6), screws (4 and
3-7.
GENERAL.
8), and washers (3, 5, 7, and 9). Connect
an overhead lifting device to clevis (31) and
The lifting frame assembly is bolted
remove lifting frame (10) from skid base.
to the skid base and provides the means of
Guide lifting frame during lifting operation
located at the top of the lifting frame to per-
to prevent damage to components.
mit attachment of a suitable lifting device.
DISASSEMBLY.
3-9.
The lifting frame is the center support for
the housing assembly. Bolted to the lifting
frame are the day tank, fuel transfer valve,
lifting frame as follows:
fuel tank filler neck and tube, and manual
a. Loosen clamp (11) and remove hose
speed control bracket.
(12).
b. Remove fuel filler cap (13), pull cap
3-8.
REMOVAL.
chain and remove filler tube (14) and cap
from filler neck (17).
ing frame as follows:
c . Remove nuts (15), screws, (16),
filler neck (17) and gasket (18) from lifting
a. Remove housing frame as specified in
frame.
b. Refer to Operator and Organizational
d. Remove nuts (19, 22, and 25),
Maintenance Manual and perform the follow-
screws (20, 23, and 26), and plates (21, 24,
ing:
and 27).
1. Remove fuel transfer valve, fuel
e. Remove cotter pins (28), nuts (29),
inlet fitting, and fuel supply outlet fitting.
screws (30), and clevis (31).
2. Remove day tank.
f. Remove retainer (41) and bracket (44)
from lifting frame by removing screws (38
3. Disconnect manual speed control
and 42) nuts (39 and 43) and washers (40).
bracket from lifting frame.
Remove bracket (44) from retainer (41) by
removing screws (35), nuts (36) and washer
4. Removal air cleaner.
(37).
3-10. CLEANING.
c . Loosen clamp (1) securing hose (12)
to fuel tank and remove hose from tank.
a. Clean old gasket from lifting frame
Plug tank opening. Remove fuel lines
and filler neck using a suitable scraper.
connected to filler neck.
b. Clean parts with an approved clean-
d. Disconnect electrical connectors from
ing solvent, and dry thoroughly.
governor control unit (34) and lift governor
3-11. INSPECTION.
control unit (34) from retainer (41). Re-
move guard (33) by removing screws (32).
a. Inspect for damaged threads.
Change
8
3-5