TM 9-6115-668-135.44PICK-UP CABLE MAINTENANCE.This task covers:a. Removalb. InstallationINITIAL SETUPToolsMaterials/PartsEquipment ConditionsGeneral Mechanic’s Tool Kit(item 2, appendix B)Automotive Fuel and Electrical System Repair, Tool Kit(item 3, appendix B)Load bank (item 19, appendix B)ReferenceGenerator Set 150 kW shutdownparagraph 2.5.2Cable ties(item 10, appendix E)Disconnect the negative battery cable first and then the positive battery termi-nal cables. Failure to observe this warning could result In severe personal Injuryor death.Tag all cables prior to removal to ensure correct connection of the cables duringinstallation.1. Remove unit hood assembly (1, figure 5-49) as instructed in paragraph 4.14.2.Open front panel (4) of control unit assembly (3) and secure with prop (5).Hold standoffs (19) while removing nuts (16).3.Remove two nuts (16), two serrated lock washers (17) and two washers (18).4.Swing digital isochronous load sharing module N4 (15) aside and open cable conduits (12 to 14).5.Record labeling and position of cables to terminal strip (11) of speed governor assembly N1 (10).6.Disconnect cables (7) from terminals 10 and 11 of speed governor assembly N1 (10).7.Remove locknut (6) of PG union on back panel of control cabinet (3) and pull actuator cable (7) with PG unionout of control cabinet (3).8. Loosen PG union and remove from actuator cable (7).Change 15-205
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business