This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools
Equipment
Conditions
Materials/Parts
General Mechanics Tool Kit
(item 2, appendix B)
Automotive Fuel and Electrical System Repair, Tool Kit
(item 3, appendix B)
Load bank (item 19, appendix B)
Reference
Generator Set 150 kW shut
down
paragraph 2.5.2
Cable ties
(item 10, appendix E)
Disconnect the negative battery cable first and then the positive battery termi-
nal cables. Failure to observe this warning could result In severe personal Injury
or death.
Tag all cables prior to removal to ensure correct connection of the Cables during
installation.
1. Remove unit hood assembly (1, figure 5-49) as instructed in paragraph 4.14.
2.
Open front panel (4) of control unit assembly (3) and secure with prop (5).
NOTE
Hold standoffs (19) while removing nuts (18).
3.
4.
5.
6.
7.
8.
9.
10.
Remove two nuts (16), two serrated lock washers (17) and two washers (18).
Swing digital isochronous load sharing module N4 (15) aside and open cable conduits (12 to 14).
Record labeling and position of cables to terminal strip (11).
Disconnect cables (9) from terminals 1 to 5 of terminal strip (11).
Remove locknut (8) of PG union on back panel of control cabinet (3) and pull actuator cable (9) with PG union
out of control cabinet (3).
Loosen PG union and remove from actuator cable (9).
Remove five nuts (23), five serrated lock washers (24), five washers (25), five screws (27), and five washers (26)
from partition (20) and remove plate (21).
Remove two screws (34). two serrated lock washers (35), and two washers (36) from plug connector (37) and
pull actuator cable (9) through opening in partition (20).