TM 9-6115-668-135.35PREHEATlNG ASSEMBLY CABLE.This task covers:a. Removalb. InstallationINITIAL SETUPToolsEquipment ConditionsGeneral Mechanic’s Tool Kit(item 2, appendix B)Automotive Fuel and Electrical System Repair, Tool Kit(item 3, appendix B)Material/PartsCable ties(item 10, appendix E)ReferenceGenerator Set 150 kW shutdownparagraph 2.5.2Disconnect the negative battery cable first and then the positive battery termi-nal cables. Failure to observe this warning could result In severe personal Injuryor death.Tag all cables prior to removal to ensure correct connection of the cables duringinstallation.1. Remove unit hood assembly (1, figure 5-45) as instructed in paragraph 4.14.2.Open front panel (3) of control cabinet assembly (2) and secure with prop (4).3.Remove eighteen screws (8), eighteen serrated lock washers (7), and eighteen washers (6).4. Lower control cabinet connection panel (5) and prop.5.Remove two nuts (26). serrated lock washers (25), washers (24), screws (22), wahers (23) and cover (27) fromcontrol cabinet assembly (2).6.Remove upper covers from bus bars and open cable conduit above load contactor K1 (16) and the one to the rightof it.7.Record labeling and position of cables (20) to load contactor K1 (16).8.Remove three nuts (17). three serrated lock washers (18), three washers (19), cables (20) and heat sinks (21)from load contactor K1 (16).9.Record labeling and position of cables to terminal strip X101 (14) on preheating control board (15).10.Disconnect cables from terminal strip X101 (14).11.Remove locknut (9) of PG union on back of control cabinet assembly (2) and pull preheating assembly cable (10)with PG union out of back of control cabinet assembly (2).5-184
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business