TM 9-6115-668-135.32BURNER MONITORING TEMPERATURE SWlTCH MAINTENANCE.This task covers:a. Removalb. InstallationINITIAL SETUPToolsEquipmentConditionsGeneral Mechanic’s Tool KitReference(item 2, appendix B) Generator Set 150 kW shutAutomotive Fuel and Electrical System Repair, Tool Kitdown(item 3, appendix B) paragraph 2.5.2Disconnect the negative battery cable first and then the positive battery termi-nal cables. Failure to observe this warning could result In severe personal injuryor death.Tag all cables prior to removal to ensure correct connection of the cables duringinstallation.1. Open flap (2, figure 5-44) on unit hood assembly (1).Do not pull round plugs off cables.2.Unplug both round plug parts (3, 4) of X109 on burner monitoring temperature switch S109 (5).3.Remove probe with microswitch (5, 6) from heating unit (10).4.Hold probe with microswitch (56) at unthreaded portion (8) and screw in threaded hex portion (7).5.Disassemble probe with microswitch (5, 6) from fasteners (7, 8, 9).1.Reassemble probe with microswitch (5, 6) and fasteners (7, 8, 9).2.Hold probe with microswitch (5, 6) at unthreaded portion (8) and screw in threaded hex portion (7).3.Install probe with microswitch (5, 6) into heating unit (10).4. Plug parts (3, 4) together.5. Close nap (2).5-180
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business