TM 9-6115-668-134.62 DIODE V3 MAINTENANCE.This task covers:a. Removalb. InstallationToolsEquipmentConditionsGeneral Mechanic’s Tool KitReference(item 2, appendix B)Generator Set 150 kW shutAutomotive Fuel and Electrical System Repair, Tool Kitdown,(item 3, appendix B)paragraph 2.5.2Materials/PartsThermoconductive paste (13, appendix E)Disconnect the negative battery cable first and then the positive bat-tery terminal cable. Failure to observe this warning could result in se-vere personal injury or death.Tag all cables prior to removal to ensure correct connection of the cablesduring installation.1.Open flap (2, figure 4-53) on unit hood assembly (1).2.Open front panel (4) on control cabinet assembly (3) and secure with prop (5).3.Remove screw (13) and disconnect cables (14, 15).4. Remove Diode V3 (12).5.Remove screw (11) and cables (10).6.Remove heat sink (9) from control cabinet by removing screws (6), serrated lockwashers (7), andwashers (8) from outside the back panel.4 - 1 4 9
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business