TM 9-6115-659-13&P
4-13 SWITCH BOX MAINTENANCE.
This task covers:
a.
Test
c.
Inspection
b.
Removal
d
Removal
INITIAL SETUP
Tools
Tool Kit, General Mechanics
(item 1, appendix B)
1/4 Inch Drill
(item 2, appendix B)
Blind Head Riveter
(item 5, appendix B)
Material/Parts
Blind Rivets
Gasket
Lock Washers (AN/MJQ-35A only)
(item 1, appendix I)
Equipment Conditions
Reference
Both generator sets shut down, paragraph
2-5.3.3. Trailer handbrakes set, front support
leg/landing leg lowered, and rear
leveling-support jack lowered; paragraph
2-3.2.1. Power cables and ground
disconnected from switch box; paragraph
4-12.
INSPECT
1.
Release clamping catches (5, figure 4-13) and open switch box cover (9).
2.
Inspect all leads and wires for worn or deteriorated insulation that reveals bare spots in conductors. If found, notify
next higher level of maintenance.
3.
Inspect all leads and wires for loose or disconnected terminal lugs. If found, repair and/or notify next higher level
of maintenance.
4.
Inspect all terminals for looseness. Tighten as needed.
5.
Inspect all component mountings for looseness. Tighten as needed.
6.
Inspect gasket (10) on switch box. If required, replace gasket (figure G-7, appendix G).
7.
Close switch box cover (9) and secure with clamping catches (5).
REPAIR
1.
CLAMPING CATCH REPLACEMENT.
a.
Drill out rivets (1) and remove defective clamping catch (2).
b.
Position new clamping catch (2) and secure with rivets (1).
Change 2 4-26