Table 4-2. Indicator Light Assernbly Test Points
TEST - TM-9-6115-659-13P_131
TM-9-6115-659-13P Power Unit PU-732/M (NSN 6115-00-280-3082) MEP-118A 15 Kw 400 Hz Generator Set M200A1 2-Wheel 4-Tire Modified Trailer Manual
Page Navigation
98
99
100
101
102
103
104
105
106
107
108
TM 9-6115-659-13&P
1.
2.
3.
4.
5.
Insert terminal leads (7) through opening in switch box housing (10) and pull through util O-ring (9)
rests against switch box cover (10).
Install lock washer (11) and mounting nut (12).
Connect terminal lugs (8) to switch box components in accordance with table 4-2.
Insert lamp (2) and O-ring (3) into lens (1).
Install lens (1) into housing (4) and hand tighten.
This task covers: a. Test
c. Installation
b. Removal
Tools
Equipment
Conditions
Tool Kit, General Mechanic’s
(item 1, appendix B)
Reference
Both
generator
sets shut down,
Material/Parts
paragraph 2-5.3.3.
Switch box cover open.
Solder
Figure 4-15. Synchronizing Light
4-31