2.3.4.5.6.7.8.9.10.11.12.13.14.TM 9-6115-659-13&PInsert terminal lug end of power cable (3 or 4) into stuffing tube assembly (13) and slide forward untilend of power cable outer covering is visible inside switchbox (1).Slide seal (12), washer (11), and stutling tube compression nut (10) forward and tighten compressionnut.Remove hex nut (6) and internal tooth washer (7) from load terminalmarked LO.Install internal tooth washer (7) and hex nut (6). Tighten hex nut.Repeat steps 4 and 5 for ground terminal and ground lead.L0 (9) and install leadRemove nuts (5, figure 4-10), lock washers (6), and flat washers (7) from contactor terminal (9) ofcontactor associated with power cable being installed.Connect power cable lead marked L1 to contactor terminal A2, lead marked L2 to contactor terminalB2, and lead marked L3 to contactor terminal C2.Install flat washers (7), lock washers (6), and nuts (5) on contactor terminals (9). Tighten nuts.Install contactor terminal shield (4), lock washers (3), and screws (2).Close switch box cover (1) and secure with clamping catches (11).Repeat steps 1,2, and 3 above and install other end of power cable in stuffing tube on generator set.Connect leads to generator set load terminals as follows:LeadMarkedto Generator Set Load TerminalGroundGroundLOL0L1L1L2L2L3L3Place clamps (5, figure 411) on replacement power cable (3 or 4) and existing ground wire going fromswitch box-ground-terminal and trailer ground stud, and install flat washers (4), screws (3), and self-locking nuts (6).4-25
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business