TM 9-6115-658-13&P
4-22
4-14 LIGHT/LAMP ASSEMBLY MAINTENANCE.
This task covers:
a. Test
c. Repair
b. Removal
d. Installation
INITIAL SETUP
Tools
Equipment Conditions
Tool Kit, General Mechanics
Reference
(item 1, Appendix B)
Soldering Gun GT7A-3
Both generator sets shut down.
paragraph 2-5.3.3.
Hand Operated Terminal Crimping Tool
Switch box cover open.
Materials/Parts
Insulation Sleeving, Heat Shrinkable
Solder
TEST
1. Measure for continuity between terminals (5, Figure 4-11). If continuity exists, replace lamp housing.
2. Measure for continuity of indicator light assembly leads (7) between terminals (5 and 8) in accordance with
Table 4-2.
Figure 4-11. Light/Lamp Assembly.