ARMY TM 9-6115-604-12NAVY NAVFC P-8-633-12MAKE CERTAIN ALL SETSARE SHUT DOWN AND THAT THERE ARE NOVOLTAGES AT SWITCH GEAR TERMINALS BEING CONNECTED TOINCOMING SET. TAKE EXTREME CARE NOT TO CROSS LO (NEUTRAL)WITH ANY OF THE OTHER PHASES (L1, L2, OR L3). DEATH BYELECTROCUTION OR SEVERE EQUIPMENT DAMAGE MAY RESULT FROMFAILURE TO HEED THIS WARNINGSTEP 1.ALL SETS: REMOVE SHORTING PLUGS (REFER TO figure 2-18) INTERCONNECT REACTIVE LOADCOMPENSATION AND GOVERNOR CONTROL PARALLELING CIRCUIT CABLES (REFER TO Figure2-17) FOR ALL SETS TO BEPARALLELED.STEP 2.ALL SETS: SET FREQUENCYDROOP/ISOCHRONOUSSWITCH TO ISOCHRONOUS.STEP 3.ENSURE OPERATION OF ON-LINE GENERATOR SET.STEP 4.ON-LINE SET: ADJUST FREQADJRHEOSTAT FOR A FREQUENCYMETER READING OF 50HERTZ OR 60 HERTZ,AS APPLICABLE.STEP 5.ON-LINE SET: SET GEN/8US VOLTMETER SWITCH TO GEN3-1.Figure 2-19. Isochronous Parallel Operation (Sheet 1 of 2)2-36