• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 4-1. Unit Preventive Maintenance Checks and Services (PMCS). CONT.
Table 4-2. Troubleshooting.

Power Plant An/Mjq-18 (Nsn 6115-00-033-1398) (2) Mep-003A 10Kw 60Hz Generator Sets M103A3 2-Wheel, 1-1/2 Ton Modified Trailer Page Navigation
  36    37    38    39    40  41  42    43    44    45    46  
img
. .
ARMY TM 5-6115-633-14&P
Table 4-1. Unit Preventive Maintenance Checks and Services (PMCS). CONT.
H Hours of operation
W -- Weekly
M Monthly
S Semiannually
A Annually
(As indicated)
(40 hours)
(500 hours)
(100 hours)
(1OOO hours)
Interval
Item
Item to be
no.
Inspected
Procedures
H
W
M
S
A
24
Brakes
a. Inspect brake linings for wear. Replace
if brake shoe lining is less than 1/8-
inch (3.2 mm) thick.
b. Inspect brake adjusting screw, retaining
screw, retaining pins, springs,
and clips for corrosion and wear.
c. Inspect hydraulic wheel cylinders for
leaks.
d. Inspect master cylinder for leaks or low
fluid level. Fill to within 1/2 inch
from top,
e, Adjust brakes (page 4-52,
TM 9-2330-213-14&P).
25
Wheel Bearings
Clean and repack (page 4-105,
TM 9-2330-213-14&P).
26
Hydraulic Brake
Inspect for dents, cracks, loose
Tubes and Hoses
connections and leaks.
27
Perform road test paying special attention
Trailer Road
Test
to items that were repaired or adjusted.
Section VI. TROUBLESHOOTING
4-13. Troubleshooting. Troubleshooting procedures for components unique to the power plant end
item are given in paragraph 4-14. Troubleshooting information for the individual generator sets and trailer
are contained in their respective technical manuals referenced below.
a. Generator Set Troubleshooting. Refer to TM 5-6115-585-12 for troubleshooting procedures
applicable to the generator set.
b. Trailer Troubleshooting. Refer to TM 9-2330-213-14&P for troubleshooting procedures
applicable to the trailer.
PIN:
064445-001
4-12
Change
1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.