• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 4-1. Unit Preventive Maintenance Checks and Services (PMCS). CONT.
Table 4-1. Unit Preventive Maintenance Checks and Services (PMCS). CONT.

Power Plant An/Mjq-18 (Nsn 6115-00-033-1398) (2) Mep-003A 10Kw 60Hz Generator Sets M103A3 2-Wheel, 1-1/2 Ton Modified Trailer Page Navigation
  35    36    37    38    39  40  41    42    43    44    45  
img
ARMY TM 5-6115-633-14&P
Table 4-1. Unit Preventive Maintenance Checks and Services (PMCS). - CONT.
W - Weekly
H Hours of operation
M Monthlv
S Semiannually
A Annually
(As indicated)
(40 hours)
(100 hours)
(1000 hours)
(500 hours)
Interval
Item to be
Item
Inspected
no.
Procedures
Inspect for broken links or missing chain(s).
Safety Chains
16
Replace any cracked, broken, or missing
Reflectors
17
refIectors.
Make sure data plates are legible and
Data Plates and
18
secure. Replace illegible data plates.
Markings
Inspect brackets and leg for bent or
Support Leg
19
broken parts.
Assembly
Inspect bracket and leg prop for bent or
Rear Leg Prop
20
broken parts.
Assembly
a. Inspect shackles, bearings, pins, leaf
Suspension
21
springs and spring eyes for damage or
Assemblies
broken parts.
b. Inspect mounting brackets for cracks
or loose or missing hardware.
c. Inspect shock absorbers for damage or
leaks.
a. Check for damaged axle tube.
Axle
22
b. Check for loose or missing U-bolts or
nuts.
a. Check serviceability of tires as
Wheels and Tires
23
indicated in TM 9-2610-200-24.
b. Tighten wheel stud nuts.
Change
4-11


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.