TM 5-6115-585-34
NAVFAC P-8-623-34
TO 35C2-3-455-2
TM05684C/05685B34
(4)
Cut a 61 in. length of adhesive backed teflon
tape (as listed in Table 10-1, item 1).
Apply adhesive backed
teflon tape to a clean right support assembly top surface
(surface that mounts against underside of skid frame). Use hand
pressure to remove air bubbles.
Clear teflon tape away from
screw slots.
(5)
Loosen four existing screws (4) and slide right
support assembly (1) between skid (2) and bevel washers (6), as
shown in figure 10-1, detail A.
(6)
Install two each screws (7), washers (8), bevel
washers (9), lockwashers (10) and nuts (11) (as listed in Table
10-1, item 1) in the two additional mounting holes (5).
(7)
Torque four existing screws (4) and the two added
screws (7) to 26 ±2 ft-lbs dry.
(8) Refer to Operator and Organizational Maintenance
Manual, paragraph 3-24 and reinstall engine lifting bracket,
shroud and blower housing.
b.
Left Support Assembly.
(1)
Refer to figure 10-3 to remove four screws (1)
and lockwashers (2) securing access plate (3) to AC output
control box assembly (4).
(2) Cut a 61 in. length of adhesive backed teflon
tape (as listed in Table 10-1, item 2).
Apply adhesive backed
teflon tape to a clean left support assembly (5) top surface
(surface that mounts against underside of support frame).
Use
hand pressure to remove air bubbles.
Clear teflon tape away from
screw slots.
(3)
Loosen four existing screws (6) and slide left
support assembly (5) between skid (7) and bevel washers (8) as
shown in figure 10-3, detail A.
(4)
Torque four existing screws (6) to 26 ±2 ft-lbs
dry.
(5)
Refer to figure 10-3 to install four screws (1)
and lockwashers (2) which secure access plate (3) to AC output
control box assembly (4).
c.
Rear Panel Assembly.
Change 6
10-7