TM 5-6115-585-34
NAVFAC P-8-623-34
TO 35C2-3-455-2
TM05684C/05685B34
CAUTION
When drilling holes, care must be taken not
to damage fuel lines.
(1)
Refer to figure 10-2, detail B and drill one 5/16
inch guide hole (12) in generator set control cubicle support
frame (13) at location shown.
(2)
Using rear panel assembly (14) as template, align
drilled guide hole (12) with bottom left rear panel assembly hole
and mark location of three remaining holes in generator set con-
trol cubicle support frame (13).
Drill three 5/16 inch holes.
(3)
Cut a 11 3/4 in. length of adhesive backed teflon
tape (as listed in Table 10-1, item 3).
Apply adhesive backed
teflon tape to a clean right side surface of rear panel assembly
(14) (surface with 2 captive nuts).
Use hand pressure to remove
air bubbles.
Clear tape from captive nut openings.
(4)
Refer to figure 10-2 to install rear panel as-
sembly (14) to generator set control cubicle support frame (13)
with four screws (15) , eight washers (16 and 17) and four
locknuts (18) (listed in table 10-1, item 3) .
(5)
Torque screws (15) to 16 ±2 ft-lbs dry.
d.
Rear Flap Assembly.
(1)
Refer to figure 10-2 and using rear flap assembly
(19) as template, center assembly on skid, resting rear flap as-
sembly angle on top of skid (2).
Mark mounting hole locations
and drill three 5/16 inch holes (20) into skid (2).
(2)
Install rear flap assembly (19) to skid (2) with
three screws (21), six washers (22 and 23) and three locknuts
(24) (listed in table 10-1, item 4).
(3)
Torque screws (21) to 16 ±2 ft-lbs dry.
e.
Rear Closure Assembly.
(1)
Refer to Operator and Organizational Maintenance
Manual paragraph 3-18 and remove air cleaner assembly.
Change 6
10-9