TM 5-6115-585-34
NAVFAC P-8-623-34
TO 35C2-3-455-2
TM05684C/05685B-34
10-3.
PRELIMINARY PROCEDURES.
Prior to ASK installation, perform the following procedures:
a.
Refer to Operator and Organizational Maintenance
Manual,paragraph 4-17, and remove the grille (30) from the
engine blower housinq.
Store qrille and attaching hardware at
owning units facility.
b.
When ASK installation is
mounted generator sets, ensure that
netted to trailer ground.
c.
Measure distance between
to be performed on trailer
generator set ground is con-
skid and tool box.
Distance
must be 10 inches minimum.
(See figure 10-1.)
If distance is
within specification commence ASK installation.
If distance is
not within specification perform the following procedures:
(1) Remove hardware securing tool box mounting
brackets.
(2) Relocate tool
inch minimum distance between
(3) Mark mounting
brackets as template.
box to a position that provides 10
tool box and skid.
holes using
(4) Drill new holes at marked
(5)
Remount tool box mounting
using existing hardware.
tool box mounting
locations.
brackets and securing
10-4.
ACOUSTIC SUPPRESSION KIT INSTALLATION.
a.
Right Support Assembly.
(1)
Refer to Operator and Organizational Maintenance
Manual paragraph 3-24 and remove engine lifting bracket, shroud
and blower housing.
(2)
Refer to figure 10-2 and locate right support
assembly (1) on skid (2) .
Align slots (3) in support assembly
(1) with existing screw heads (4) and using support assembly (1)
as template, mark the two additional mounting holes (5) .
(3)
Drill two 7/16 inch holes (5) into skid (2) for
right support assembly (1) .
Change 6
10-5