TM 5-6115-585-34NAVFAC P-8-623-34TO 35C2-3-455-2TM–05684C/05685B-3410-3.PRELIMINARYPROCEDURES.Prior to ASK installation, perform the following procedures:a.Refer to Operator and Organizational MaintenanceManual,paragraph 4-17, and remove the grille (30) from theengine blower housinq.Store qrille and attaching hardware atowning units facility.b.When ASK installation ismounted generator sets, ensure thatnetted to trailer ground.c.Measure distance betweento be performed on trailergenerator set ground is con-skid and tool box.Distancemust be 10 inches minimum.(See figure 10-1.)If distance iswithin specification commence ASK installation.If distance isnot within specification perform the following procedures:(1) Remove hardware securing tool box mountingbrackets.(2) Relocate toolinch minimum distance between(3) Mark mountingbrackets as template.box to a position that provides 10tool box and skid.holes using(4) Drill new holes at marked(5)Remount tool box mountingusing existing hardware.tool box mountinglocations.brackets and securing10-4.ACOUSTICSUPPRESSIONKITINSTALLATION.a.Right Support Assembly.(1)Refer to Operator and Organizational MaintenanceManual paragraph 3-24 and remove engine lifting bracket, shroudand blower housing.(2)Refer to figure 10-2 and locate right supportassembly (1) on skid (2) .Align slots (3) in support assembly(1) with existing screw heads (4) and using support assembly (1)as template, mark the two additional mounting holes (5) .(3)Drill two 7/16 inch holes (5) into skid (2) forright support assembly (1) .Change 610-5
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business