TM 9-6115-668-13
Item
Location
No.
Interval
Item to Check/Service
Procedure
ENGINE COMPARTMFNT -
continued
43.
Before
Air flap
44.
Before
Air flap puller magnet
MENT
GENERATOR COMPART-
45.
Before
Fuel Fill Hose
46.
Before
Battery Set
47.
Before
Air cooling inlet grate
48.
19.
During
Front panel door
During
Control cabinet assembly
Table 24 Operator Preventive Maintenance Checks and Services-continued.
Check that air flap moves easily
Air flap does not mow
and closes automatically.
smoothly.
Check that cable is firmly at
tached to air flap puller magnet
and is undamaged. Check label.
ing of J104.
Check that hose is firmly at-
tached to fuel tank and fuel filler
neck. Check hose clamps.
Check that batteries and connec-
Batteries or connec-
tors are secure.
tors are missing.
Inspect air coling inlet grate for
Air cooling inlet grate
looseness, damage, or dirt.
is clogged.
High voltage is produced
when this Generator Set
150kW is in operation could re
sult in personal injury or
death.
Check condition and operation of
Front panel door can-
front panel door.
not be opened.
a. Check all indicators and
Indicators or controls
controls for damaged or
are damaged or miss-
missing parts.
ing.
b. Check that designation
plates are firmly attached
and readable.
c. Check that all lamps and in-
dicators operate properly.
Not Fully Mission
Capable if:
Cable is loose or dam,
aged.
Cracked hose, broken
clamps or fuel leak.
Change 1
2-27